|
Tunnel-chamber Operation of a tunnel-chamber (anti-theft chamber). Motetema, Limpopo Province, South Africa - Client : Sekhukhune Farmers Development Trust - Designed and built by Dams for Africa, February 2004 |
| Back to main Chamber page | Back to Home page |
(1) The anti-theft chamber in its closed and locked position. The borehole pump is started | (2) Using a special opening tool the tunnel can be lifted up and wheel-assemblies may be inserted into the sides of the tunnel. |
|
(3) The tunnel may now be pushed backwards until the chamber is fully open, allowing access to the borehole, pump and motor - if maintenance is required. |
4) The tunnel-chamber protects the borehole/motor/ |
|