Dams : Spillways Rehabilitation of eroded spillways. GaMabintane, Limpopo, South Africa - Client : Africare SA - Designed and built by Dams for Africa, December 2002 |
| Back to main Dam page | Back to Home page |
(1) The Village dam's spillway, which is cut into dispersive clay, was seriously eroded. | (2) The rehabilitated spillway - a 1,5m deep trench was excavated and filled with concrete as a cut-off. The trickle flow is now directed to the opposite side of the spillway - where the original channel had suffered minimal erosion. |
|
(3) The Poplar dam's spillway, also cut into dispersive clay, was also seriously eroded. | (4) The rehabilitated spillway - floodwaters are now channelled to a 1,5m gabion weir and the energy of the falling water is dissipated on gabion mattresses in front. |
|